Skip to content
Zealogics
Contact
The Zea suite
EngineeringIQ logoZeaSuite

Late design changes cut 38%

Reads specs, drawings and change orders to catch the requirement conflict before it reaches the shop floor.

Best for: Complex product engineering with heavy spec and ECO trafficPilot: 8 weeksDeploys: On-prem / VPCAutomotive

What EngineeringIQ is

Spec conflicts caught before the shop floor.

−38%

Late design changes

Conflicts caught pre-release

11 days

ECO cycle time

From 26 days

$1.4m

Avoided rework / yr

Illustrative, single programme

The business challenge

Everything takes too long — ECO cycle from 26 days to 11 with automated impact. Rework and errors cost us — Catches tolerance and spec conflicts before tooling. Audits are painful — Immutable finding history for design reviews.

The problem

The conflict is found in production, not in review.

  • Requirements live across specs, drawings, BOMs and supplier PDFs.
  • ECO impact is assessed by whoever remembers the dependency.
  • One missed tolerance clash costs a tooling cycle.

What the app does

Machine-checked traceability across every engineering artefact.

  • Requirements extracted and linked to parts, tests and suppliers.
  • Conflicts and orphan requirements surfaced before release.
  • ECO blast radius computed in minutes, with evidence.